Skip to main content
TEAM ARKA

Installation & Workmanship

EV Charger Handover: What to Check Before the Installer Leaves

Before the installer leaves, confirm the charging rate to expect, the settings used and the test records, and learn which breaker and cable route belong to the charger.

Updated
Written by
Hassan Yusof
Reading time
3 min read
A TEAM ARKA team member showing a finished wall charger on a porch wall.

Why the handover matters

A kW figure that looks low is not always a wrong setting. The charging rate has to be compared with what your car can accept and with the setup that was installed.

Before the technician leaves, go through these five points together.

1. The charging rate to expect

Ask the installer to explain the rate that suits your EV model and your home’s supply, then look at the reading while the car is charging. From there, you know what to expect in daily use.

2. The settings used

For example, what the charging current limit is set to, and why that value was chosen.

If the setup uses dynamic load balancing (DLB), ask when the charging rate can change with the home’s electricity use.

3. What was recorded after testing

Ask for a record of the final settings and the charging reading during the test, together with the results of the electrical inspection and testing.

That record is your reference if you notice a change in performance later.

4. The charger’s breaker and isolator

Ask the installer to show you the breaker for the EV charger circuit, and make sure its label is clear. If there is an isolator switch for the charger, ask where it is and what it does.

5. The cable route from the DB to the charger

Look at the wiring route from the distribution board (DB) to the charger: which parts are visible, and which run through the ceiling or hidden spaces.

This is useful when there is an inspection or renovation work later. If you add an awning or more lights at the porch, the contractor needs to know that the EV charger cable runs through that area.

Photos taken during the installation are a good first reference. The actual route still has to be confirmed before any drilling starts.

Car not delivered yet? See can a home EV charger be tested before your car arrives.

Want the setup explained, not just installed?

Contact TEAM ARKA. We check, install, test and explain the setup, so you know the charging system in your own home.

Frequently asked questions

Why does my charger show fewer kW than I expected?

The rate depends on what your car accepts, your home’s supply and the current limit set on the charger. With DLB, it can also change with the home’s electricity use. Ask the installer what rate to expect for your car.

What records should I ask for after installation?

The final settings, the charging reading during the test, and the results of the electrical inspection and testing.

Why do I need to know where the charger cable runs?

So that later work, such as an awning or new porch lights, does not damage it. Confirm the actual route before any drilling starts.

Still unsure? Ask TEAM ARKA on WhatsApp.

Ask on WhatsApp (opens WhatsApp in a new tab)

Planning a home charger?

See how our installation service works, from assessment to handover.

EV Charger Installation

Keep reading

Get a Quote

Not sure what your property needs?

Tell us about your home or premises and your EV. We will explain the options and what a site assessment would check before quoting.

Helpful to have ready

  • A photo of your distribution board (DB)
  • Where you park and where the charger could go
  • Your EV model, if you already have one