Commercial EV charging
EV charging for workplaces, buildings and car parks
From condominium basements to multi-storey car parks and shop lots, charging starts with the site’s electrical capacity. We check it first, then propose a setup that works now and leaves room to grow.

Who it is for
Charging for the people who use your site
Condominiums and residential buildings
Management bodies planning charging for residents, with metering and fair use of the building’s capacity.
Workplaces
Charging for staff or visitors at offices and business premises.
Car parks and commercial properties
Multi-storey car parks, shop lots and retail sites adding charging for customers or tenants.
Fleets and operational sites
Depots and premises where company vehicles charge between shifts.
Our approach
How we approach commercial projects
References and project details are shared during project discussions.
Requirement first
Who will charge, how often and for how long, before any hardware is chosen.
Capacity checked on site
Available capacity and distribution, so the plan works within the site’s supply.
Metering and fair use
Where chargers share a building supply, use is metered so billing between users is clear.
Room to grow
Charging for what you need now, planned so more chargers can be added where the supply allows.
Project stages
How a project runs
Step 1: Requirement
Your users, vehicles, locations and timing.
Step 2: Feasibility check
On site: capacity, distribution and possible charger positions.
Step 3: Technical proposal
A quotation with a technical proposal for owners and management to discuss.
Step 4: Installation
Work scheduled with the site and its management to limit disruption.
Step 5: Testing and handover
Testing, commissioning and a handover to your team.
Registrations
Registered with Suruhanjaya Tenaga and CIDB
Suruhanjaya Tenaga electrical contractor
Class C. Registration no. ST(TKL)SGR/C/KE/05678/2025, valid until 7 December 2028.
CIDB registered contractor
Grade G2 (B04, CE21, E04, M15). Registration no. 0120210510-WP074343, valid until 20 September 2028.
Talk to TEAM ARKA
Discuss a commercial charging project
Share your site and requirement. We arrange a conversation and, where needed, a feasibility check on site.
Get a response within an hour on WhatsApp.