
Home Readiness
Single-Phase or Three-Phase: Do You Need to Upgrade for a Home EV Charger?
Not always. A single-phase home can usually charge at up to about 7 kW. What decides it is how much load your home already uses, and when.
3 min read
Home EV charger installation
We check your supply, distribution board and cable route before we quote, then install, test and hand over a setup that suits your home and your EV. More than 1,000 installations so far.

Where are you starting from?
We check your site and quote to install the charger you own, as long as it suits your supply.
Ask for an installation quoteWe recommend a charger that suits your car and your supply, and quote the charger and installation together.
See our chargersSend us photos of your DB and parking space. We tell you what your home can support before you buy anything.
Ask for a readiness checkBefore we install
A charger draws a high current for hours at a time. These checks decide what a safe, tidy installation needs.
Every home is different. The site assessment confirms what yours needs.
Your supply type and the load already on it, including air conditioning at night, when most EVs charge.
The board’s condition, the main switch, and room for a new protected circuit.
Earthing tested, not assumed, and residual-current protection matched to the charger circuit.
The safest, tidiest path from the DB to the charger, and how long it is.
Easy to plug in every day: the charging port, how you park and the cable length.
Your car’s AC charging rate and daily driving, so the setup is neither over- nor under-sized.
How it works
Tell us about your home and your EV. Photos of your DB and parking space give us an early view.
We check the supply, the DB, the earthing and the best place for the charger.
You get the scope and the price in writing before any work is booked.
The circuit, protection and charger are installed along the agreed route.
The installation is tested and the charger set up for your car.
We show you how to use the charger, what was tested and how to reach us.
Scope and price
How far the charger is from the distribution board.
Whether the cable runs through walls, ceilings or open areas.
Concealed and ceiling routes usually take more work than surface trunking.
Set by the charger’s current and the length of the run.
Some boards need repairs or extra protection before a new circuit is added.
If the existing supply is not enough, we explain the options before quoting.
Registered and accountable
Suruhanjaya Tenaga electrical contractor
Class C. Registration no. ST(TKL)SGR/C/KE/05678/2025, valid until 7 December 2028.
CIDB registered contractor
Grade G2 (B04, CE21, E04, M15). Registration no. 0120210510-WP074343, valid until 20 September 2028.
Our work






FAQ
Not for most homes. A single-phase supply can usually take a charger of up to about 7 kW. Three-phase is only needed to charge at 11 kW or more, and only helps if your car accepts it.
Yes. Send photos of your DB, meter and parking space on WhatsApp for an early view. We confirm the details at the site assessment.
Yes. We assess your site and quote to install a charger you already own, as long as it suits your supply and the location.
It depends on the cable route and any work needed at the distribution board. Your quotation sets out the scope, and we agree a date with you before starting.
Our installation work carries a 1-year workmanship warranty. The charger’s own warranty depends on the manufacturer and model.
Guides

Home Readiness
Not always. A single-phase home can usually charge at up to about 7 kW. What decides it is how much load your home already uses, and when.
3 min read

Cost & Planning
Extra charges usually come from a change in the scope of work. Know what your quotation includes and what still needs confirming, and agree any change before work starts.
2 min read

Home Readiness
Start with approval from the management. Then there are two ways to supply the charger: from your own unit, or from the building’s electrical facilities.
2 min read
Talk to TEAM ARKA
Share a few details about your home and your EV. We explain the next step, usually a site assessment, before we quote.
Get a response within an hour on WhatsApp.